This past Saturday, June 2,
Izzy and Beth Vonnahme helped me tear out more of the house.
The first thing Izzy and I did when we got there was move a 4.5 foot cast-iron tub out of the downstairs bathroom and up a flight of stairs.
That will wear you out in a hurry. Shortly after that, Beth arrived and removed the counter, cabinets, and toilet out of the upstairs bathroom while Izzy and I finished removing the floor from the downstairs bathroom.
We then proceeded to the kitchen. Since these cabinets were built and installed on-site, there was going to be no elegant way to remove them, so we had fun with a sledgehammer. The counter itself, as well as the sink was saved, though because the Formica counter was simply set on the cabinets, not secured to it! And guess what! There was mold behind the cabinets that were on the floor! Surprised?
So, the "gutting to-do countdown" is as follows:
1. Rest of the kitchen (the buffet, closet, and cabinet over buffet)
2. Laundry room
3. Upstairs bathroom floor and walls
4. Laundry room (floor, cabinets, and probably walls)
We'll be working on the 9th, but taking the 16th off for our Anniversary (June 14).