A little more progress to report. Last Saturday Robb and I managed to get boxes and wiring in the kitchen. All the wire is there, and run back to the breaker box, although nothing is yet hooked up. We ran wire for the dishwasher, refrigerator, garbage disposal, microwave (required because our microwave is "large," i.e. above 1000 watts), small appliances (counter outlets), and the 120/220 line for the oven. The circuit for lighting will come later. Fun stuff.
Next up:
- Insulation removal
- New furring downstairs (removed the old/rotted stuff)
- Spray foaming the outside walls (4 inches for R28)
- Wiring the rest of the house.